Resin bound aggregate is not poured over an existing gravel surface. The stone is mixed with polyurethane resin and trowelled onto a prepared, stable base in a single continuous layer. Where an existing tarmac or concrete base is sound, an overlay is possible. Where it is not, the correct route is excavation, compaction, and a new MOT Type 1 sub-base. Cambridge’s clay soil makes that base assessment especially important, an overlay on a failing base will lift.
Drainage falls are set during the sub-base stage, not corrected afterwards. Border edging is installed before the resin layer goes down to contain the mix and give a clean finish line. The resin and aggregate are mixed on site and applied within the working time of the resin binder. Cure time before the surface takes foot or vehicle traffic is typically 24 hours, depending on temperature.
A site survey covers base condition, drainage direction, edging options, and aggregate selection before any quote is issued. Cambridge front drives subject to Cambridgeshire planning guidance benefit from the permeable finish, which means most installations do not require householder permission. Each stage, excavation, sub-base, drainage, and resin finish, is quoted as a separate line item.