Inadequate Sub-Base
A sub-base laid too shallow or without proper compaction allows the surface to sink and crack within the first winter.
MOT Type 1 to Depth
MOT Type 1 hardcore is laid and compacted to the correct depth for the ground conditions found at the site survey.